Joint sheet metal MB 120, OVERLAP type
full mineral coating on both sides

article number 070486

test of durability Water pressure test

joint sheet metal - packing 50 pieces
length 2400 mm, width 120 mm
55 pcs fixing clips
150 pcs mounting brackets
The elements must  overlap at
least 20 cm  in the area of joint !!

General Building Supervisory Board Test Certificate by MPA Braunschweig

 

Add to notice list

The most important information at a glance

switch_to_language DE
switch_to_language GB
switch_to_language FR
switch_to_language NL
switch_to_language IT
switch_to_language ES
switch_to_language CZ
switch_to_language PL
switch_to_language RO
switch_to_language DK
switch_to_language SE
switch_to_language NO
switch_to_language FI
switch_to_language RS
switch_to_language RU
switch_to_language GR
switch_to_language TR

Go to Youtube

start Animation
article number:
070486
article group:
299 - Sonder Warengruppe 2
GTIN:
4251689511479
customs tariff number:
73269098
packing unit:
crate
sales quantity unit:
120 m
weight per:
crate = 135.6 kg
material:

St 37, galvanized
special coating: mineral

colour:
yellow
surface:

hard, rough

length of joint sheet metal:

2.40 m

height of joint sheet metal:

120 mm

thickness of joint sheet metal:

approx. 0.6 mm

thickness of special coating:

approx. 0.4 mm

total thickness:

approx. 1.0 mm

test certificate / approvals:

General Building Supervisory Test Certificate (AbP)
 MPA Braunschweig
 No.: P-1200/691/17 MPA-BS

 Assessment report; storage in liquid manure, slurry,
 silage effluent
 MPA Braunschweig
 (1200/549/17) - Pan

 

suitable for zones with frequently varying water levels:

yes

corresponds to:

Utility class A for the wear classes 1 and 2 in
accordance with the WU guideline

storage:

Store in undamaged and unopened original
packaging in a dry place out of direct sunlight.

thermal scope of application:
- 20°C to + 90°C
waterpressuretightness:
Up to max. 2.5 bar ( 25 m water column )
storage:
Store in undamaged and unopened original packaging in a dry place out of direct sunlight.
disposal:
Can be disposed of at municipal waste landfill sites, taking into account the local waste disposal
regulations.

The product is delivered in a wooden crate.

The Joint sheet metal MB Overlap elements and the fixing clips are in the crate.


Joint sheet metal MB Overlap elements are supplied ready to install.
A protective foil does not need to be removed.

Place the elements in the centre of the rising wall on top of the upper reinforcement layer.

Push the mounting brackets, 3 pcs/element, over the sheet metal and fix them to the upper reinforcement layer with binding wire.

The embedment depth in the concrete must be at least 3 cm and must not be more than half the height of the sheet metal (8 cm).


The joint of the Joint sheet metal MB Overlap can be made without glue, only by overlapping the two ends.

The length of the overlap must be at least 20 cm.

There must be no contamination on the surfaces that could interfere with bonding.


The joint must be secured with one of the fixing clips provided.

Attention: The Joint sheet metal MB Overlap must not be plugged into the fresh concrete subsequently.


Corners can be formed by sharp-edged bending in-situ on the
building site.


After some alignment the edge can be fixed on the reinforcement.


To facilitate the fixing of the Joint sheet metal MB Overlap on the reinforcement start installation in a corner.

The placement of concrete in the area of the Joint sheet metal MB Overlap and corresponding preparations must be carried out in accordance with the established technical standards.

Status: 23.03.2022


Accessories

suitable accessories

Fixing clip h=170 mm

for securing the element joints   ...

Contact us

We are happy to answer your questions

Please enter name
please_enter_company
please_enter_city
Please enter email
Please enter subject
Please enter message

Please fill the following captcha to reduce spam.

Please enter captcha.

We are not allowed to get in touch if you do not agree with our data privacy statement.