Tip Standard (S)
številka izdelka 070295
Kategorija elementa za zapahovanje z grobim spojem
Pri tesnjenju cikličnih ali gradbenih stikov se postavljajo visoke zahteve glede tehnologije tesnjenja.
V celoti prevlečeni opažni elementi iz ABS zagotavljajo, da so ciklični ali betonski stiki varno in trajno zatesnjeni pred tlačno in netlačno vodo.
Ob naročilu je treba navesti zahtevano višino vgradnje, da se doseže najboljši možni rezultat.
na obrazec za naročilo/zahtevo
Dodaj na seznam obvestilNajpomembnejše informacije na prvi pogled
St 37, pocinkano
Posebna prevleka: polimerna plastika, ojačana s tkanino
2,50 m
160 mm
510 - 600 mm
Evropska tehnična ocena
Nemški inštitut za gradbeno tehnologijo (DIBt), Berlin
Potrdilo o preizkusu splošnega gradbenega inšpektorata
MFPA Leipzig
ja
V skladu s smernicami WU uporabite razred A za razred obremenitve 1 in 2
Na paletah za enkratno uporabo,
Na voljo posamično, vključno z dvema udarnima sponkama/elementom
Ne
Ja
The stopend panel joint sheet metal ABS is positioned between the lower and upper reinforcement layer (foundation – foundation area) or the outer and inner reinforcement layer (wall – wall area).
The perforated plate is fastened to the reinforcement using binding wire.
The individual elements can be pushed into one another, they must overlap by at least 7 cm and the joint must be secured with two fixing clips.
With higher constructional element thicknesses, the stopend panel joint sheet metal ABS must also be stiffened in order to be structurally load-bearing.
Before the segment is concreted, the protective foil must be removed from the joint sheet metal.
The protective foil in the section not to be concreted remains on the joint sheet metal.
Once the shuttering for the concrete segment is complete, the segment can be concreted.
The area around the stopend panel joint sheet metal ABS must be carefully waterproofed to ensure that the joint sheet metal is fully embedded in the concrete on all sides.
Cavities behind the perforated plate must be avoided.
In the second concrete segment, as soon as the protective foil has been removed immediately before concreting, concrete can be placed directly against the stopend panel joint sheet metal ABS.
In this case, the concrete must also be carefully waterproofed in the area of the stopend panel joint sheet metal ABS.
Shrink holes or reinforcement shadow must not form around the joint sheet metal.
The distance between the "installation dimension E" reinforcement is decisive when ordering the stopend panel joint sheet metal ABS
Status: 23.03.2022
Dodatki
primerna dodatna oprema
Širina perforiranega lista 600 mm ...
Podobni izdelki
Podobne izdelke lahko najdete tukaj.
Kategorija elementov za zapiranje z blokiranim spojem Pri tesnjenju kolesarskih ali gradbenih stikov so postavljene visoke zahteve...
Pišite nam
Z veseljem bomo odgovorili na vaša vprašanja