Totalmente revestido por ambos lados con base
número de artículo 070468
El sellado de juntas de construcción de hormigón plantea grandes exigencias a la tecnología de sellado.
Las láminas de sellado completamente revestidas Rolle-F con base garantizan que las juntas de construcción de hormigón queden selladas de forma segura y permanente contra el agua de prensado y no prensada.
La información más importante de un vistazo
St 37, galvanizado
Revestimiento especial: plástico polímero reforzado con tejido
20,00 m
160 mm
Aproximadamente 0,6 mm
Aproximadamente 0,15 mm
Aproximadamente 0,9 mm
Certificado de prueba de la autoridad general de la construcción (AbP)
MFPA Leipzig
ja
Utilizar clase A para clase de carga 1 y 2 de acuerdo con la directriz WU
No
Ja
Cartón (40 x 40 x 20 cm)
1 rollo
2 soportes de fijación
36 cajas por palet
Prueba de aplicación técnica hasta 8 bar
Packaging
1 Role with 20 m
2 fixing clips
Remove the bottom half of the parted protective foil from the special coating.
Place the Joint Sheet Metal Role-F on the top reinforcement in the center of the rising wall. Use binding wire to tie the fastening foot to the reinforced layer. The emedment depth in the concrete must be at least 3 cm and must not exceed half of the sheet height (8 cm).
By bending and crimping a festenig foot to the opposite side (approx. every 50 cm) the position of the sheet can be addtionally stabilized.
In the corner area, the sheet is bent according to the course of the corner. It is advisable here to bend over a "sharp" edge.
At transition joints, the Joint Sheet Metal Role-F must be overlapped by at least 6cm. For this purpose, the protective film is folded badk along the length of the overlap.
The overlapping surfaces are pressed together over the entire surface and secured with one of the supplied fixing clips. Ther must be no dirt on the adhesie surfaces that could impair the bonding.
The Joint Sheet Metal Role-F must form a self-contained, defect-free circuit. The upper half of the protective film must remain on the special coating until the latest possible time. The concreting of the wall base and the corresponding preparations for this must be carried out in accordance with the recognized technical regulations.
Status: 23.03.2022